mail : enquiry@bimoutsourcing.com
US Toll Free : (+1) 713 429 1909
Backfilling,construction
We need jelly of different sizes, and sand for the top of the pit. The big jelly at the bottom form large gaps for the water to pass through. The smaller ones on the top of it will support the layer of sand. A mesh between the sand and the jelly will prevent the sand from escaping below.
The values corresponding to their thermal conductivity are:
Custom Search
- Air system balancing and testing
- Air vent installation
- Air-conditioning system installation
- Bathroom, sanitary ware installation
- Blower, fan, cooling, dry heating,
- Boiler chipping, cleaning and scaling
- Boiler, heating,installation
- Central air-conditioning equipment
- Central cooling equipment, piping
- Central heating equipment
- Chilled water system installation
- Chimney liner installation
- Commercial freezer installation
- Commercial refrigeration system
- Cooling tower installation
- Drain, waste and vent system
- Drinking fountain installation
- Dry heating equipment installation