mail : enquiry@bimoutsourcing.com
US Toll Free : (+1) 713 429 1909
About Drain, waste and vent system installation
The most important step of building a DWV system is the design stage. Every sink, tub, toilet and drain needs to be vented to the outside through a vent stack. If you are adding a new sink, such as for a wet bar or for a bathroom expansion, then it is important to know where the current waste pipes are. In newer construction, DWV pipes are primarily made of PVC pipe. In older homes, pipes may be constructed of cast iron or copper.
Custom Search
- Air system balancing and testing
- Air vent installation
- Air-conditioning system installation
- Bathroom, sanitary ware installation
- Blower, fan, cooling, dry heating,
- Boiler chipping, cleaning and scaling
- Boiler, heating,installation
- Central air-conditioning equipment
- Central cooling equipment, piping
- Central heating equipment
- Chilled water system installation
- Chimney liner installation
- Commercial freezer installation
- Commercial refrigeration system
- Cooling tower installation
- Drain, waste and vent system
- Drinking fountain installation
- Dry heating equipment installation
HVAC
DISCLAIMER
All contents of this page are taken from http://www.ehow.com/how_4769645_drain-waste-vent-systems.html