About Precast concrete panel, slab, or form installation

Precast concrete foundation and wall panels can take many forms. Some consist of steel-reinforced concrete ribs that run vertically and horizontally in the panels. Others are solid precast concrete panels. Panels are precast and cured in a controlled factory environment so weather delays can be avoided. A typical panelized foundation can be erected in four to five hours, without the need to place concrete on site for the foundation. The result is a foundation that can be installed in any climate zone in one sixth of the time needed for a formed concrete wall.


Custom Search


DISCLAIMER

All contents of this page are taken from www.toolbase.org